Home |   Company   |   Products   |   Valve Info   |   Quality   |   Downloads   |   Contact Us   |
    Always follow standard safety procedures when working on ball valve. Flush the pipeline before installing the valve. Debris allowed to remain in the pipeline (such as weld spatters, welding rods, bricks, tools, etc.) can damage the valve. After installation, cycle the valve a minimum of three times and re-torque bolts as required. For butt weld end valves Ensure that the valve is in the open position and the inside of the body bore of the valve body/body end is coated with a suitable spatter guard. The post weld heat treatment must be localized. Make sure to keep intense heat away from the main portion of the valve (seats and ball). Do not cover valve in stress relieving blankets. The temperature of the main body section should not exceed the rated valve temperature. In certain applications, it may be necessary to remove all internal 'soft' material because of contractor heat treatment requests.
Copyright © 2008-2010 Valvesupplier website All Rights Reserved     
replica handbags Replica Louis Vuitton Wholesale Replica Handbags Replica Louis Vuitton Louis Vuitton handbags Gucci handbags Prada Handbags Replica Handbags replica watches replica rolex watches replica handbags replica watches Omega replica watches replica rolex watches breitling replica watches Replica Handbags lOUIS VUITTON Handbags Replica Handbags iwc watches swiss replica watches replica Handbags replica Handbags replica watches replica watches replica watches Hermes Handbags Burberry Handbags Alexander Wang Bottega Veneta Handbags Dior Handbags Chloe handbags Thomas Wylde Handbags Loewe Handbags Valentino handBags replica Hermes Belts Jimmy Choo Handbags Fake handbags Bottega Veneta Handbags Replica Versace Handbags Marni Handbags Replica Belts Versace Handbags Miu Miu handbags Replica Belts Balenciaga Handbags Lancel Handbag Fianl Sales Handbags Louis Vuitton handbags Replica Handbags